Gypsy and Traveller Sites
Gypsy and Traveller Sites
Evidence Base - 2022 onwards
Gypsy and Traveller Site Need and Supply Background Paper (January 2022)
- Appendix 1: Planning Policy for Traveller Sites (Annex 1 - Glossary)
- Appendix 2: Rugby Local Plan 2011-2031 (adopted 2019) - Policy DS2 and paragraphs 4.20 to 4.28
- Appendix 3 Table A - Authorised permanent sites at 31 August 2017
- Appendix 3 Table B - Authorised temporary sites at 31 August 2017
- Appendix 3 Table C - Unauthorised sites at 31 August 2017
- Appendix 4A- Permanent Gypsy and Traveller sites permitted from 1 September 2017 to 31 October 2021
- Appendix 4B - Temporary Gypsy and Traveller sites permitted from 1 September 2017 to 31 October 2021
- Appendix 5 - Authorised and Unauthorised Gypsy and Traveller sites at 1 November 2021
- Appendix 6 - Map of Existing Gypsy and Traveller Sites at 1 November 2021
Gypsy and Traveller Accommodation Needs Assessment (September 2022)
Gypsy and Travellers Site Allocation Development Plan Document - Issues and Options (October 2022)
Previous Evidence
Previous evidence associated with gypsy and traveller sites.